02/SOLUTIONS INDEX

THE FORTEX
FLOOR PLAN.

Every service Fortex fields, laid out like the facility they belong to. Click a bay to open scope. Everything is executed in-house by badged crews.

// COVERAGE
SAN DIMAS
+ LA COUNTY
SAN DIMAS · POMONA · LA VERNE
GLENDORA · COVINA · AZUSA
CITY OF INDUSTRY · WALNUT
// S-01FORTEX / OPS

STRUCTURAL CONSTRUCTION

Ground-up industrial builds, steel erection, tilt-up panels, load-bearing retrofits. Concrete work engineered to survive seismic and freight loads.

  • Steel frame erection
  • Tilt-up concrete
  • Foundations & slabs
  • Seismic retrofits
// S-02FORTEX / OPS

FACILITY MAINTENANCE

Continuous-uptime maintenance for warehouses, cold storage, manufacturing plants. HVAC, plumbing, electrical, envelope.

  • Preventive contracts
  • HVAC & refrigeration
  • Roof & envelope
  • Dock & door systems
// S-03FORTEX / OPS

INFRASTRUCTURE REPAIR

Utility grids, storm drains, industrial pipelines, and site civil work. Repairs that survive atmospheric rivers and forklift traffic.

  • Storm drainage
  • Industrial pipelines
  • Site paving & grading
  • Underground utilities
// S-04FORTEX / OPS

EMERGENCY RESPONSE

24/7 dispatch. Structural failure, flooding, forced entry, power loss. Crews rolling within 60 minutes across the San Dimas sector.

  • Structural triage
  • Water & flood extraction
  • Emergency shoring
  • Temp power & envelope
// S-05FORTEX / OPS

CONCRETE & STEEL RESTORATION

Spall repair, epoxy injection, weld reinforcement, corrosion control. Reinforcement over replacement wherever possible.

  • Spall & crack repair
  • Weld reinforcement
  • Cathodic protection
// S-06FORTEX / OPS

TENANT IMPROVEMENTS

Industrial TI packages. Racking, mezzanines, dock reconfigurations, warehouse office fit-outs. Kept operational during work.

  • Mezzanine installs
  • Racking systems
  • Office fit-outs
// S-07FORTEX / OPS

COMPLIANCE & INSPECTION

Third-party inspection prep, code correction, permit closeout. Documentation stamped and filed the same day.

  • Code corrections
  • Permit closeout
  • Third-party inspection prep

SCOPE OUTSIDE THIS INDEX?
WE STILL BUILD IT.

SUBMIT A SCOPE →